Welcome to the Bihar Current Affairs edition for 11 July 2026, prepared for BPSC Prelims and Mains aspirants. Today’s roundup covers the widespread floods affecting ten districts as the Kosi and other rivers cross the danger mark, the hiring of six Musahar women as bus drivers under the Pink Bus initiative, and a set of state cabinet decisions clearing four Regional Rapid Transit System corridors, land for the expansion of AIIMS Patna, three new Kendriya Vidyalayas and an extension of the youth self-help allowance scheme. Each item carries background, Bihar relevance and a Prelims fact table.

1. Floods Hit Ten Districts as Kosi Crosses the Danger Mark

Why in News: In July 2026, floods affected several lakh people across about ten districts of Bihar as the Kosi and other major rivers rose in spate, with heavy discharge released from the Kosi Barrage.

Background: The Ganga, Gandak, Kosi, Bagmati and Mahananda were all flowing in spate due to continuous rain in their catchments, including heavy rainfall in Nepal. The Kosi crossed the red mark at Supaul and Saharsa, and about 1,10,845 cusecs of water was released from the Kosi Barrage. Districts including Bhagalpur, Munger, Begusarai, Vaishali, Bhojpur, Khagaria and Patna were among those reported hit. The Kosi, often called the Sorrow of Bihar, carries heavy silt from the Nepal Himalaya, raising riverbeds and breaching embankments in the monsoon. This connects to Bihar geography, rivers and disaster management.

Bihar Relevance: Prelims Kosi (Sorrow of Bihar), Kosi Barrage, danger mark, affected districts. Mains GS1 rivers and floods; GS3 disaster management and flood control.

Prelims Fact Detail
People affected Several lakh
Districts hit About ten
Rivers in spate Ganga, Gandak, Kosi, Bagmati, Mahananda
Kosi status Crossed red mark at Supaul and Saharsa
Barrage discharge About 1,10,845 cusecs
Kosi nickname Sorrow of Bihar

2. BSRTC Hires Six Musahar Women as Bus Drivers

Why in News: The Bihar State Road Transport Corporation (BSRTC) hired six women from the Musahar community as bus drivers, a step hailed as a milestone for women’s mobility and social inclusion in a largely male-dominated sector.

Background: The six women, from among the state’s most deprived Dalit groups, were trained and inducted as drivers as part of Bihar’s Pink Bus initiative, which envisages buses run for the safety and convenience of women commuters and fitted with panic buttons, GPS, cameras and sanitary-pad vending machines. While most of the state’s public bus fleet is still driven by men, this induction is an early and symbolically important step toward putting women behind the wheel. The Pink Bus plan covers cities such as Patna, Gaya, Bhagalpur, Muzaffarpur, Darbhanga and Purnia and is being expanded through electric buses under the PM e-Bus Seva scheme. This connects to Bihar women’s empowerment, social inclusion and urban transport.

Bihar Relevance: Prelims Bihar State Road Transport Corporation, Pink Bus, PM e-Bus Seva, Musahar community. Mains GS1 women and society; GS2 welfare delivery and urban transport.

Prelims Fact Detail
Development Six women hired as bus drivers
Operator Bihar State Road Transport Corporation
Community Musahar (Dalit)
Initiative Pink Bus
Cities planned Patna, Gaya, Bhagalpur, Muzaffarpur, Darbhanga, Purnia
Central scheme PM e-Bus Seva

3. Cabinet Approves DPRs for Four RRTS Corridors

Why in News: The Bihar cabinet, chaired by CM Samrat Choudhary, gave in-principle approval to prepare Detailed Project Reports and an Alternative Analysis Report for four proposed Regional Rapid Transit System (RRTS) corridors.

Background: The approval, at an estimated cost of about 31.59 crore rupees for the study and reports, is the first step toward high-speed regional rail links connecting Patna with nearby urban and industrial centres. A Regional Rapid Transit System is a dedicated, high-speed, high-frequency commuter rail network designed to cut travel time between a metropolis and its satellite towns, on the model of the Delhi-Meerut RRTS. Better regional connectivity is expected to ease congestion, support balanced urban growth and boost economic activity around Patna. This connects to Bihar infrastructure, urban transport and regional planning.

Bihar Relevance: Prelims Regional Rapid Transit System, Detailed Project Report, Alternative Analysis Report. Mains GS3 infrastructure and urban transport; GS2 governance and planning.

Prelims Fact Detail
Approval In-principle for four RRTS corridors
Reports DPR and Alternative Analysis Report
Study cost About 31.59 crore rupees
System Regional Rapid Transit System
Hub Patna and nearby centres
Model Delhi-Meerut RRTS

4. Cabinet Clears Land for AIIMS Patna Expansion and New Kendriya Vidyalayas

Why in News: The state cabinet approved the acquisition of land for the expansion of AIIMS Patna and allotted land for three new Kendriya Vidyalayas in the state.

Background: The cabinet cleared acquisition of about 26.76 acres for the expansion of AIIMS Patna at an estimated cost of about 348.89 crore rupees, strengthening tertiary health care and medical education in the state. It also approved allotment of five-acre land parcels each in Madhubani, Munger and Muzaffarpur to the Kendriya Vidyalaya Sangathan under the Union Ministry of Education, expanding access to quality central-board schooling. These decisions reflect the state’s focus on health and education infrastructure. This connects to Bihar health and education governance and Centre-State cooperation.

Bihar Relevance: Prelims AIIMS Patna, Kendriya Vidyalaya Sangathan, Madhubani, Munger, Muzaffarpur. Mains GS2 health and education infrastructure; cooperative federalism.

Prelims Fact Detail
AIIMS land About 26.76 acres
AIIMS cost About 348.89 crore rupees
KV land Five acres each
KV locations Madhubani, Munger, Muzaffarpur
Agency Kendriya Vidyalaya Sangathan
Ministry Union Ministry of Education

5. Cabinet Extends Youth Self-Help Allowance Scheme

Why in News: The Bihar cabinet extended the Mukhya Mantri Swayam Sahayta Bhatta Yojana, the youth self-help allowance scheme, for another five years.

Background: The scheme provides a monthly allowance to unemployed youth for a fixed period while they search for jobs, along with soft-skill and language training to improve employability. The extension covers the financial years 2026-27 to 2030-31, with administrative approval for an estimated outlay of about 300 crore rupees for 2026-27. Such support schemes aim to bridge the gap between education and employment and reduce distress among educated unemployed youth in the state. This connects to Bihar skilling, employment and welfare.

Bihar Relevance: Prelims Mukhya Mantri Swayam Sahayta Bhatta Yojana, self-help allowance, skilling. Mains GS2 welfare schemes and youth employment; GS3 skilling and employability.

Prelims Fact Detail
Scheme Mukhya Mantri Swayam Sahayta Bhatta Yojana
Benefit Monthly allowance to unemployed youth
Extension 2026-27 to 2030-31
Outlay 2026-27 About 300 crore rupees
Add-on Soft-skill and language training
Aim Bridge education-to-employment gap

BPSC Practice MCQs

Q1. During the July 2026 Bihar floods, the Kosi crossed the danger mark at which of the following places?

  • (a) Supaul and Saharsa
  • (b) Patna and Bhojpur
  • (c) Gaya and Nawada
  • (d) Rohtas and Kaimur

Answer: (a) The Kosi crossed the red mark at Supaul and Saharsa, with heavy discharge released from the Kosi Barrage.

Q2. In a step hailed as a milestone for women’s mobility, BSRTC recently hired six women bus drivers from which community?

  • (a) Musahar
  • (b) Kurmi
  • (c) Yadav
  • (d) Bhumihar

Answer: (a) The Bihar State Road Transport Corporation hired six women from the Musahar community, one of the most deprived Dalit groups, as bus drivers under the Pink Bus initiative.

Q3. The Bihar cabinet approved DPRs for four corridors of which transit system?

  • (a) Regional Rapid Transit System
  • (b) Metro Neo
  • (c) Bus Rapid Transit System
  • (d) Light Rail Transit

Answer: (a) The cabinet gave in-principle approval to prepare reports for four Regional Rapid Transit System (RRTS) corridors.

Q4. The cabinet cleared about 26.76 acres of land for the expansion of which institution?

  • (a) AIIMS Patna
  • (b) IIT Patna
  • (c) NIT Patna
  • (d) Patna Medical College

Answer: (a) The cabinet approved acquisition of about 26.76 acres for expanding AIIMS Patna at an estimated cost of about 348.89 crore rupees.

Q5. The Mukhya Mantri Swayam Sahayta Bhatta Yojana extended by the cabinet provides support mainly to whom?

  • (a) Unemployed youth searching for jobs
  • (b) Old-age pensioners
  • (c) Widows and destitute women
  • (d) Small and marginal farmers

Answer: (a) The scheme gives a monthly self-help allowance and skill training to unemployed youth, and was extended for 2026-27 to 2030-31.