Welcome to your Bihar current affairs digest for 25 June 2026. Today’s edition is led by a busy Bihar Cabinet that cleared 13 proposals spanning health, fisheries, power and large private investments, alongside fresh tourism and monsoon updates that matter for BPSC Prelims and Mains. Each item below carries a verified news trigger, background, BPSC relevance mapping and a Prelims facts table, followed by the Fact File and five practice MCQs.
1. Bihar Cabinet Clears 13 Proposals, Raises Medical Aid Limit to Rs 4 Lakh
Why in News: On 24 June 2026, the Bihar Cabinet chaired by Chief Minister Samrat Choudhary in Patna approved 13 proposals, the headline decision being a hike in the annual income eligibility limit under the Chief Minister’s Medical Assistance Fund from Rs 2.50 lakh to Rs 4 lakh.
Background: The Chief Minister’s Medical Assistance Fund supports poor and lower-income patients needing costly treatment. Raising the income ceiling widens the pool of eligible beneficiaries, easing out-of-pocket health expenditure. The same Cabinet sitting touched fisheries, power, industry and food processing, signalling a development-and-welfare push ahead of the 2026 Assembly elections. This connects to Bihar’s social welfare and public health governance.
BPSC Relevance: Prelims, name of the fund and the revised income limit. Mains GS2, role of state welfare funds in healthcare access and the principle of out-of-pocket expenditure reduction under Universal Health Coverage.
| Prelims Fact | Detail |
|---|---|
| Decision date | 24 June 2026 |
| Chair | CM Samrat Choudhary |
| Scheme | Chief Minister’s Medical Assistance Fund |
| Old income limit | Rs 2.50 lakh per year |
| New income limit | Rs 4 lakh per year |
| Total proposals cleared | 13 |
2. Cabinet Approves Varun Beverages and Grain Silo Investments
Why in News: Among the 24 June Cabinet decisions, Bihar cleared financial incentives for Varun Beverages Limited to set up a manufacturing facility at Navanagar in Buxar district with a proposed investment of about Rs 483.51 crore, and approved a roughly Rs 83.25 crore grain storage silo project by Leap Agri Logistics near Rajnagar in Madhubani district.
Background: The Varun Beverages unit will produce carbonated soft drinks, juice-based beverages and packaged water, and includes a 3 MW solar power component, with direct employment projected for around 400 workers. The 50,000 metric tonne grain silo strengthens post-harvest storage in north Bihar. Navanagar in Buxar is emerging as a western Bihar industrial hub. This connects to Bihar’s industrial promotion and agri-logistics policy.
BPSC Relevance: Prelims, location of the Varun Beverages plant (Buxar) and the silo (Madhubani). Mains GS3, role of private investment, food processing and storage infrastructure in raising farmer incomes and reducing post-harvest losses.
| Prelims Fact | Detail |
|---|---|
| Varun Beverages location | Navanagar, Buxar district |
| Varun Beverages investment | About Rs 483.51 crore |
| Solar component | 3 MW |
| Grain silo investor | Leap Agri Logistics |
| Silo location and capacity | Rajnagar, Madhubani, 50,000 MT |
3. Integrated Aquaculture Park Approved at Banasur, Bhojpur
Why in News: The 24 June Cabinet approved an Integrated Aquaculture Park at the Banasur Fish Seed Project in Bhojpur district at a cost of about Rs 31.20 crore, to be developed under the Pradhan Mantri Matsya Sampada Yojana (PMMSY).
Background: The park aims to boost fish production and productivity, provide modern aquaculture infrastructure, and offer training in fish processing, trade and scientific techniques. Bihar is a leading inland fisheries state, and the project is a centre-state shared initiative meant to lift the incomes of fishers and fish farmers. This connects to Bihar’s fisheries and rural livelihoods sector.
BPSC Relevance: Prelims, location (Bhojpur), cost, and the parent scheme PMMSY. Mains GS3, blue revolution, allied agriculture and rural employment generation in Bihar.
| Prelims Fact | Detail |
|---|---|
| Project | Integrated Aquaculture Park |
| Location | Banasur Fish Seed Project, Bhojpur |
| Cost | About Rs 31.20 crore |
| Parent scheme | Pradhan Mantri Matsya Sampada Yojana |
| Sector | Inland fisheries and aquaculture |
4. Two-Tier Consumer Grievance Forum for Electricity Consumers
Why in News: The Bihar Cabinet on 24 June approved the formation of a two-tier Consumer Grievance Redressal Forum under the Bihar State Power Holding Company, creating new posts of Chief Engineer and Electrical Superintendent for faster resolution of electricity consumer complaints.
Background: A structured grievance mechanism is a statutory expectation under the Electricity Act framework and helps consumers get time-bound redress on billing, metering and supply complaints before approaching the regulator. The new posts add administrative capacity to the state power utility. This connects to Bihar’s power sector governance and consumer rights.
BPSC Relevance: Prelims, the two-tier forum and the new posts created. Mains GS2, consumer grievance redressal mechanisms and accountability in public utilities.
| Prelims Fact | Detail |
|---|---|
| Body | Two-tier Consumer Grievance Redressal Forum |
| Parent | Bihar State Power Holding Company |
| New posts | Chief Engineer, Electrical Superintendent |
| Purpose | Faster electricity complaint resolution |
5. Buddhist Circuit Roads and Twin-City Tourism Master Plans
Why in News: Bihar’s flagship Buddhist Circuit road network connecting Bodh Gaya, Rajgir, Nalanda and Vaishali is in its final construction phase, with several four-lane routes targeted to open by year-end, even as the state finalises tourism master plans treating Gaya to Bodh Gaya and Rajgir to Nalanda as “twin cities”.
Background: Key routes include the Patna to Gaya to Dobhi road, the Amas to Darbhanga Expressway, and the Gaya to Hisua to Rajgir to Nalanda to Bihar Sharif road. Despite high footfall at Bodh Gaya and Rajgir, few tourists stay overnight, so the master plan aims to extend stays to two to four days by improving connectivity and the visitor experience. This connects to Bihar’s tourism economy and heritage development.
BPSC Relevance: Prelims, the four Buddhist Circuit nodes and key road corridors. Mains GS1 and GS3, heritage tourism, employment and infrastructure-led economic growth in Bihar.
| Prelims Fact | Detail |
|---|---|
| Buddhist Circuit nodes | Bodh Gaya, Rajgir, Nalanda, Vaishali |
| Sample corridor | Amas to Darbhanga Expressway |
| Twin-city pairs | Gaya to Bodh Gaya, Rajgir to Nalanda |
| Aim | Extend tourist stays to 2 to 4 days |
6. Southwest Monsoon Advances Over Bihar, IMD Rainfall Alert
Why in News: The India Meteorological Department reported that the Southwest Monsoon advanced over more parts of Bihar around 23 June 2026, with widespread rain and heavy to very heavy rainfall warnings issued for Bihar along with Odisha, Jharkhand and West Bengal, and advisories on localised flooding and waterlogging.
Background: Bihar’s north Bihar plains, drained by the Kosi, Gandak and Bagmati, are highly flood-prone during the monsoon. Early and intense rainfall raises the risk of waterlogging and river swelling, making early IMD warnings and disaster preparedness critical. This connects to Bihar’s geography, monsoon and disaster management.
BPSC Relevance: Prelims, monsoon onset over Bihar and flood-prone rivers. Mains GS1 and GS3, monsoon mechanism, flood management and disaster preparedness in the Kosi basin.
| Prelims Fact | Detail |
|---|---|
| Agency | India Meteorological Department (IMD) |
| Monsoon advance over Bihar | Around 23 June 2026 |
| Alert level | Heavy to very heavy rainfall warning |
| Flood-prone rivers | Kosi, Gandak, Bagmati |
| Risk flagged | Localised flooding, waterlogging |
BPSC Practice MCQs
Q1. The Bihar Cabinet on 24 June 2026 raised the annual income eligibility limit under the Chief Minister’s Medical Assistance Fund to which amount?
- (a) Rs 2.50 lakh
- (b) Rs 3 lakh
- (c) Rs 4 lakh
- (d) Rs 5 lakh
Answer: (c) , The income limit was raised from Rs 2.50 lakh to Rs 4 lakh per year.
Q2. The Integrated Aquaculture Park approved by the Bihar Cabinet at Banasur is located in which district, and under which central scheme?
- (a) Bhojpur, under Pradhan Mantri Matsya Sampada Yojana
- (b) Madhubani, under PMFME
- (c) Buxar, under PMMSY
- (d) Nalanda, under Blue Revolution Mission
Answer: (a) , The park is at the Banasur Fish Seed Project in Bhojpur under the Pradhan Mantri Matsya Sampada Yojana.
Q3. The Varun Beverages manufacturing facility approved by the Cabinet, with an investment of about Rs 483.51 crore, is to be set up at:
- (a) Rajnagar, Madhubani
- (b) Navanagar, Buxar
- (c) Hajipur, Vaishali
- (d) Bihta, Patna
Answer: (b) , The unit is proposed at Navanagar in Buxar district and includes a 3 MW solar component.
Q4. Which of the following are nodes of Bihar’s Buddhist Circuit being connected by new four-lane roads?
- (a) Bodh Gaya, Rajgir, Nalanda, Vaishali
- (b) Patna, Gaya, Buxar, Bhagalpur
- (c) Madhubani, Darbhanga, Sitamarhi, Motihari
- (d) Munger, Begusarai, Khagaria, Saharsa
Answer: (a) , The Buddhist Circuit links Bodh Gaya, Rajgir, Nalanda and Vaishali, with Gaya to Bodh Gaya and Rajgir to Nalanda planned as twin cities.
Q5. The two-tier Consumer Grievance Redressal Forum approved by the Bihar Cabinet operates under which body?
- (a) Bihar State Pollution Control Board
- (b) Bihar State Power Holding Company
- (c) Bihar State Road Development Corporation
- (d) Bihar Renewable Energy Development Agency
Answer: (b) , It was created under the Bihar State Power Holding Company to speed up resolution of electricity consumer complaints.